
Stormwater infiltration tunnel XL – Middle module
The middle module of stormwater infiltration tunnel XL is manufactured to withstand heavy traffic loads and to provide efficient infiltration, attenuation and treatment of rainwater and surface water.
For easy handling, the middle module features integrated lifting eyes on the top and pre-marked cut-out positions for fast, accurate pipe connections - reducing installation time on site. Multiple modules can be combined in-line via the module ribs to achieve the required tunnel length and volume, and several modules can be delivered on one pallet.

Stormwater infiltration tunnel XL – Middle module
Sale price
0,00 DKK
eks. moms
Regular priceeks. moms
(/)

